Testimonials

Project – Stanford Diversion Canal & Bukit Timah First Diversion Canal

I appreciate your innovative, flexible and focussed approach together with a great team spirit and work ethic. Your outstanding engineers and their full commitment to satisfy the client is a key asset to be successful. It will be a pleasure to work with you again.

Michael Kronthaler, Vice President – Engineering and Estimating, Sembawang Engineers and Constructors

Project – Narrows Marine Crossing

The service that NOMA has provided has been excellent from every aspect. Delivery of design and response time by NOMA is well above the standard of most engineering firms. Both the site teams and myself have enjoyed working with you and your team. I look forward to working with you guys again in the future!

Tracie L. Fong, Design Manager, Thiess Tunnelling

Project – Grosvenor Coal Mine Project

NOMA delivered exactly what we requested and definitely met all of our expectations. Particularly the extra mile you went during mapping of the exposed rock face, in very difficult conditions was appreciated. This effort, along the knowledge/skills has been recognised by our client also.

Peter Gaylard, Senior Project Engineer, Redpath Australia

Project – Wheatstone Project

I was happy with what you guys did. You delivered practical/buildable solutions for tricky problems i.e. temporary works, turnaround of work was quick was a critical factor for us on that project and was extremely appreciated and the designs aren’t overall conservative which is what we seem to get from the big firms.

Dan Rae, Senior Project Engineer, Thiess Tunnelling

Project – Woogaroo Creek Trunk Sewer Upgrade

NOMA’s design reflected the method of construction. This is not always the case with temporary works. I was especially impressed by the presentation of sketches and drawings, at no additional costs for minor changes.

John Bower, Design Manager, WDS Limited

Project – Waterview Connection Tunnels – Auckland, New Zealand

I wish to thank NOMA for their great work. It is not easy to join a big 80+ person team and quickly find your place, effectively getting on with the job but everyone from NOMA did it superbly. Everyone made significant contributions to the conventional tunnel design as well as the TBM solution and assisted in the development of the overall offering to our client. I would welcome the opportunity to work with you on similar projects in the future.

John Bridgman – Design Manager, AECOM New Zealand

Project – Airport Link and Northern Busway Project

Andreas Amon worked closely with my construction team and site design representatives. He was was a tireless and dedicated technical leader whose commitment and thorough technical understanding, whilst often confronted by complex geological and construction constraints, provided insight and inspiration to those around him. I wish Andreas every success in the future and would happily work alongside him again.

Scott Connor, Senior Project Engineer, Kedron, Thiess-John Holland Joint Venture

Andreas Amon is a first class engineer. He has the ability to design from first principles and use complex numerical analysis where required to develop practical solutions that can be constructed in the field. He also works well with construction teams and where feasible will modify designs to suit contractor’s methods of work to realise production and cost savings without comprising safety or increasing risk. He is a team player who enjoys mentoring and developing his team. The quality of his work is outstanding. I would have no hesitation in recommending him.

Eddie Woods, Tunnel Design Manager, Parsons Brinckerhoff-Arup Joint Venture

Our project is a highly complex underground arrangement consisting of large span structures in challenging ground and groundwater conditions. The detailed design work was required to be completed to a high standard of detail, fully documented and reviewed, all within the demanding timescale of a design and construction environment. Andreas was fundamental in the successful delivery of the tunnel design work of the Airport Link Project as the Technical Lead and was a real pleasure to work with due to his engineering capabilities and approachable nature.

Bill Heron – Senior Tunnel Design Manager, Thiess John Holland Joint Venture